All Chapters of The Dead Zone Sovereign : Chapter 51
- Chapter 60
66 chapters
Chapter 51: The Polar Inversion Confrontation
The weather data from the metal tower at Mile Marker 775 showed that the cold air was moving in fast. The air pressure was dropping low which meant the storm was going to hit hard. This was going to make the temperature drop a lot like 45 degrees, across the area. To keep the trains pipes from freezing Valen told everyone to stop the delivery schedule and focus on getting the train ready for the bad weather.Marcus put the green train in the maintenance bay, where the big concrete walls would protect it from the wind. Kaels team started putting on a snow plow, which was like a big metal shield. This shield was made to lift and push away the snow from the train tracks. The team had to attach the plow to the train using bolts and special grease to keep it from getting stuck.LOCOMOTIVE PLOUGH INSTALLATION LOG. UNIT TWOThe plow was made of carbon steel and weighed four tons. It was two and a quarter inches above the train tracks. The team checked to make sure it was stable and secure.W
Chapter 52: The Sector Sixty Integration and Locomotive Fabrication Campaign
To get into the part of the Sector Sixty Western Locomotive Repository the team had to carefully get rid of the airlock pressure that had been keeping the place sealed off. The big bronze doors were really heavy and strong with iron stiffeners to help hold them in place. These doors were locked tight with a pressure difference of negative four point six pounds per square inch compared to the outside air. Kael wanted to make sure the doors did not get damaged when they were opened so he put in a device to equalize the air pressure. This device used two brass valves to let air into the room.It took seventy-two minutes for the air pressure to balance out. When it finally did Tors team used jacks to push the big steel pins out of the way and the bronze doors swung open. The inside of the repository was well preserved, with no rust or damage on the steel machine tools. The team found three locomotive frames, each made of strong carbon steel plates and cast steel blocks. These frames were
Chapter 53: The Alkaline Terrace Alignment and Locomotive Unit Three Shunting Campaign
The verification of Locomotive Unit Three across the transition trackage of the Sector Sixty-Three boundary pass marked the start of the advanced western plains offensive. The barometric instruments in the observation car recorded a sharp stabilization of the atmospheric pressure at 29.6 inches of mercury. This meant the core of the inversion had shifted towards the high northern peaks. The level plains of Sector Sixty-Four were now exposed to a low-density wind from the south-southwest.This change reduced the hazard of rime ice accumulation along the injector lines. However it introduced a complication. High-density alkaline dust sheets rose from the plains. These created an atmosphere that threatened the integrity of the locomotive driving rod bearings.Valen ordered a halt at Mile Marker 852. This allowed Kaels mechanical squads to implement modifications to the running gear of both active motive power units. The twelve-wheel layout of Locomotive Unit Three presented a surface are
Chapter 54: The Volcanic Shelf Transition
The train had to be changed a lot to go from the portal of the Sector Sixty-Nine repository to the upper part of the Volcanic Shelf. The Volcanic Shelf was a job. The people who worked on the train like Marcus had to make some changes to the trains engines. They had to do this because the air was thinner at the top of the Volcanic Shelf. The trains boiler had to be changed so it could keep running.The Volcanic Shelf was made of black rock and soft ash. The hard rock was good for the trains tracks. The soft ash was not. It could make the tracks move around which was bad. So Kael and his team had to put down tracks that would not move. They used steel beams and iron ties to make the tracks strong.The team had to remove a lot of ash from the Volcanic Shelf. They used machines and a lot of hard work to do this. Once the ash was removed they could put down the tracks. The tracks were made of steel beams and iron ties. They were very strong. Could hold a lot of weight.The team also had t
Chapter 55: The Great Alkali Silt Basin and Desert Aqueduct Reclamation Campaign
The train left the edge of Sector Seventy-Three and entered Sector Seventy-Four. This sector was a desert known as the Great Alkali Silt Basin. As Locomotive Unit Three moved past Mile Marker 968 the landscape changed. The dark basalt shelves of the mountain passes turned into sand dunes and white alkali flats.The air temperature rose sharply. The train descended into the basin floor. The temperature indicators on the boiler jacket showed an increase from 22 degrees below zero to 84 degrees Fahrenheit.This rapid temperature change caused problems. The high ambient temperature reduced the cooling efficiency of the condenser units. It also caused the lubricants in the axle journal cellars to thin out. This risked causing friction heat in the bearing sleeves.Marcus adjusted the feed regulators of the lubricators. He delivered a stream of refined whale oil stock mixed with 15% thick petroleum mineral fat into the axle boxes. This created a high-pressure oil film that could withstand th
Chapter 56: The Shelf Transition
The area where Sector Seventy-Eight meets Sector Seventy-Nine has a big change in the earths surface. As Locomotive Unit Three hauled the construction fleet past Mile Marker One Thousand and Twenty-Two the hard basalt rock gave way to a shiny plain of black obsidian glass and dark volcanic rock. This area, called the Shelf has unique problems that challenge the machines and the tracks. The surface of the glass plain is very smooth, polished by winds and it gets very hot during the day. It's also very slippery for the locomotives wheels.* The first big problem happened within two leagues of entering the sector. The obsidian dust caused the wheel flanges of the leading cars to wear out fast.* The fine glass particles rose from the rail heads in clouds that got into the journal boxes and threatened to damage the axles.* Kael directed the crews to use a continuous oil-wash system on the forward wheel sets.* This system used a stream of oil mixed with graphite grease to protect the mov
Chapter 57: The Sovereign Assembly
The air inside the assembly bay of Western Heavy Mechanical Repository Six was very steady and calm. The thick walls kept the winds of Sector Eighty-One from getting in. For three days the inside of the building was filled with the sound of hammers hitting metal and the high sound of steam machines. Kaels workers and Gars blacksmiths were working together to get the big machines ready. They were building a Locomotive Unit Four. This machine would use the Pattern Twelve chassis to pull heavy loads up steep mountains.The Pattern Twelve chassis was a strong and well-made piece of equipment. It was made of steel. Was forty-four feet long. It weighed thirty-six tons when it was empty. This was different from the machines used in the eastern coastal areas. The Pattern Twelve had six axles with wheels, which made it very good at pulling heavy loads. To get this big machine ready the workers had to clean off the grease and use special tools to make sure everything was working properly. The
Chapter 58: The Resonance Corridor
Locomotive Unit Four entered the part of Sector Eighty-Four. This marked a change from the uniform gypsum platforms that were in the lower basins of the previous territory. As the seventy-foot rail sections moved into the area at Mile Marker One Thousand and Ninety-Four the ground beneath them changed. It became a layer of highly fractured bituminous shale with deep seams of compressed volcanic ash. This made the track bed unstable. The massive dynamic wheel loads of the ninety-ton locomotive could displace the -grade materials and cause big vertical alignment errors.To stop the softening of the ash layers Kael started using the High-Density Calcified Grouting System right away. This system used a series of secondary mixer cars attached to the material train. The stabilization operation needed the processing of local limestone aggregate from the Sector Eighty-Three cutting archives. The raw stone was crushed inside the mixer car’s rotary cylinders. It was mixed with a twelve-percent
Chapter 59: The Geothermal Calcification Terraces
We left Western Heavy Mechanical Repository Eight under a ash-filled sky. The morning light was a grey across the volcanic tuff formations. Locomotive Unit Four was at the head of the forty-element material fleet. Its firebox gave off a white heat. This kept the boiler pressure at two hundred and five pounds per square inch.The mechanical integration of the twelve-wheel driving chassis was complete. The six coupled axles moved across the repository yard with a rhythmic sound. This confirmed the alignment of the journal boxes. Kael monitored the movement from the footplate. He checked the temperature of the eccentric rod bearings with a copper-cased probe. This ensured the high-viscosity whale oil lubricant was spreading evenly.The terrain past Mile Marker One Thousand One Hundred and Twenty-Four changed quickly. It went from compacted gypsum platforms to a -acidic geothermal zone. This zone was called Sector Eighty-Six Crystalline Rift. It had thermal vents that released superheated
Chapter 60: Thermal Induction Track Systems
The Cryogenic Permafrost Fault And Thermal Induction Track Systems were a problem for the team at Western Heavy Mechanical Repository Nine. They had to leave the repository under an gloomy sky. The sky was so low that it made the whole area look like it was in a shadow. The team was led by Locomotive Unit Four. It was a machine with a lot of power. The temperature was very cold. It was minus fourteen degrees Fahrenheit. This was a problem because the steel rails could break easily in such cold weather.Kael was in charge of checking the steel rails. He used a tool to see if the rails were good enough to use in the cold weather. The rails were made of a kind of steel that was good for normal weather but not for very cold weather. Kael did some tests. Found out that the steel was not good enough. He told Valen that they could not use the rails in the weather. If they did the rails would. The train would not be able to move.Kael said that they had to find a way to keep the rails warm. T